Integrated management and optimization of construction project schedule, cost and quality
Download as PDF
DOI: 10.25236/iwass.2018.131
Corresponding Author
Zhan Xiaran
Abstract
In the construction project, the progress, cost and quality as the key indicators are not isolated, but the unity of opposites and complement each other. In the construction project management, when determining the management objectives of each indicator, it is necessary to consider the impact of other link objectives, and carry out integrated management and optimization. Based on the relationship between construction project schedule, cost and quality, this paper discusses the comprehensive management and optimization of construction project schedule, cost and quality, and proposes integrated management and optimization measures for construction projects.
Keywords
Schedule, Cost, Quality, Construction Project, Relationship, Integrated Management, Optimization