Research on Dynamic Cost Management and Optimization Strategy of High-rise Building in Construction Stage
Download as PDF
DOI: 10.25236/icacel.2025.146
Corresponding Author
Yanping Du
Abstract
The construction stage of high-rise buildings is faced with challenges such as large investment scale, complex technology, high risk sensitivity and long construction period. The traditional static cost management model is difficult to cope with the dynamic changes in the construction process, resulting in high cost overruns. This paper analyzes the influencing factors of high-rise building construction cost, and constructs a dynamic cost management system based on real-time monitoring, rapid response and digital tool application. Aiming at the design, construction, material procurement and project management, the optimization strategies and implementation paths are put forward, including simplifying the structural scheme, rationally planning the building volume, applying prefabricated components, strengthening cooperation and communication, analyzing the cost performance of materials, purchasing in batches, optimizing transportation and storage, and linking schedule management with cost control. By implementing these strategies, the project cost can be effectively controlled, the investment benefit can be improved, and the healthy development of the construction industry can be promoted.
Keywords
Dynamic Cost Managemen, High-rise Building, Construction Stage