Research on the Application of Whole-Process Engineering Cost Consultation in Construction Project Management
Download as PDF
DOI: 10.25236/icacel.2025.055
Corresponding Author
Mei Zhao
Abstract
Construction projects often face challenges such as "creative overspending," "uncontrolled changes," and "settlement chaos" due to disjointed cost management across various stages, akin to a journey without guidance that easily deviates from the cost route. From the perspective of "whole-life cycle collaboration," this article focuses on the application of whole-process engineering cost consultation in construction projects. It encompasses investment estimation in the decision-making stage, quota control in the design stage, dynamic adjustments during the construction stage, and closed-loop review upon completion and settlement. The study reveals how consulting agencies adopt strategies of "precision, penetration, real-time monitoring, and rigor" to break down cost management barriers across all phases.
Keywords
Engineering Cost Consultation, Whole-Life Cycle Cost, Dynamic Control, Limit Design