The best way to conference proceedings by Francis Academic Press

Web of Proceedings - Francis Academic Press
Web of Proceedings - Francis Academic Press

Research on Total Cost Control Model and Evaluation Method of Prefabricated Buildings

Download as PDF

DOI: 10.25236/eeha.2024.040

Author(s)

Aiyu Zhang

Corresponding Author

Aiyu Zhang

Abstract

In view of the complicated cost control of prefabricated buildings, imperfect management system and evaluation system, affecting the promotion and use of prefabricated buildings, the key influencing factors of prefabricated building costs are determined according to the whole process, whole life cycle, comprehensive cost management theory and comprehensive evaluation theory, and five sub-systems are established: direct construction cost, quality cost, safety cost, environmental protection cost and construction period cost. It is of great significance to improve the management level of prefabricated buildings by establishing the dynamic simulation model and management evaluation system of the total cost control system and studying the cost and global optimization method of the prefabricated buildings from production to construction.

Keywords

Prefabricated Building, Cost Control, Cost Simulation, Evaluation Method