Research on engineering cost calculation system of intelligent landscape greening project
Download as PDF
DOI: 10.25236/ieesasm.2024.013
Corresponding Author
Xuemin You
Abstract
Aiming at the problems such as incomplete project cost information and data, imperfect enterprise quota, lack of systematic management system, inability to reflect the actual consumption level of construction enterprises, inaccurate cost calculation, and impact on bidding and bidding, BP neural network intelligent estimation system is established based on project cost control theory, scientific statistical theory and BP neural network. The construction drawing budget historical database of completed projects is constructed, and the historical data with high similarity to the target cases are selected as the data basis for intelligent estimation, which has certain practical significance for improving the cost management level of landscape engineering.
Keywords
Landscape engineering; Whole process management; Cost management, intelligent calculation