The best way to conference proceedings by Francis Academic Press

Web of Proceedings - Francis Academic Press
Web of Proceedings - Francis Academic Press

Research on Supplier Selection of Epc Project Based on Fuzzy Topsis

Download as PDF

DOI: 10.25236/icidel.2017.032

Author(s)

Xiaoting Yang, Shixia Duan

Corresponding Author

Xiaoting Yang

Abstract

The EPC mode has gradually become the mainstream in the field of engineering construction in China, which is clearly stated in the"13th Five-Year Plan" issued by the State Council. Procurement as EPC general contract in the economy accounted for an important part of the larger, shortened the delivery time, reduceed the overall procurement costs, so as to win more profit margins for enterprises. Therefore, this paper, from the perspective of general contracting, combines the EPC resource integration characteristics and the supply chain management theory, constructs the fuzzy entropy TOPSIS selection model and the specific decision step. Finally, the specific application of this method in bidding is analyzed with an actual case, so as to provide a reference for the supplier selection decision of the EPC general contracting project.

Keywords

EPC project, Supplier selection, Fuzzy TOPSIS.