Research on Construction Management and Quality Inspection of Assembled Buildings
Download as PDF
DOI: 10.25236/eeems.2018.045
Author(s)
Xu Chonghua, Wang Na
Corresponding Author
Xu Chonghua
Abstract
The traditional construction management has a long construction period and many hidden safety hazards. To adapt to the green sustainable development road, the best choice is assembly building. However, the development of prefabricated buildings is relatively slow. In order to guarantee the comprehensiveness of construction management and improve the quality of prefabricated construction, this article first introduces the prefabricated buildings, analyzes the differences between traditional production methods and prefabricated buildings, and discusses on-site hoisting mode. According to the drawbacks of the construction problem, the concurrent engineering theory was put forward and the design process diagram was elaborated. For the problem of resource and energy consumption, the EPC management model and quality inspection were proposed. Finally, the full text was summarized.
Keywords
Prefabricated Construction, Quality Inspection, Construction Management, Concurrent Engineering Theory