Research on Integrated Management Method of BIM Isomerous Data for Engineering Construction Period
Download as PDF
DOI: 10.25236/icscbd.2018.025
Author(s)
Yan Li, Zhao Junjie
Corresponding Author
Yan Li
Abstract
Information management measures of digitized and informationalized construction project provide space to solve these kinds of problems, at present, technology measure with best application effect is BIM technology. This paper makes research on integrated management method of BIM isomerous data for engineering construction period.
Keywords
Engineering Construction Period, Bim Isomerous Data, Integrated Management Method