Study on the Compilation and Optimization of Construction Organization Design-taking G310 Luoyang City as an example
Download as PDF
DOI: 10.25236/ssah.2018.210
Author(s)
Huixin Liu, Chunxia Zhang
Corresponding Author
Huixin Liu
Abstract
Reasonable scientific construction organization design is not only the core of the entire project technical guidance, but also a comprehensive embodiment of a construction enterprise's management level. It is important to guarantee that the project be carried out orderly. On the basis of predecessors, the author learned the construction organization design through accessing to literature and specific case studies. Taking the construction design of G310 Luoyang City as an example, the paper analyses the research and construction. The study shows that in the construction of G310 Luoyang City, the construction process of the construction of a pavement is complicated, and the staffing process is lacking in flexibility. These will make the project during construction lack of detailed reference and guidance, affecting the duration and quality of the project. Through the analysis and summary, the author puts forward the strengthening management, the introduction of advanced technology, Luoyang site investigation and environmental considerations, combined with the characteristics of the project by marking the special engineering parts, so that the entire construction organization design and staffing are more mature, in order to achieve the purpose of the construction organization.
Keywords
Construction design, Preparation and analysis, Personnel management, Cost control, Progress control.